Home / Guides

How to calculate the true cost of a production batch

Short answer: add up what the batch really consumed (materials at their actual cost including wastage, direct labour and a fair share of overhead) and divide by the good output. That gives the true cost per unit, which is the only safe basis for pricing and profit.

The formula

Batch cost = materials used (at actual cost, including wastage) + direct labour + allocated overhead

Cost per unit = batch cost ÷ good units produced

A worked example

An illustrative batch of printed pouches:

ItemCost (Rs)
Film: 500 kg at Rs 520 per kg260,000
Inks and adhesive30,000
Direct labour for the run40,000
Overhead share (power, machine hours, supervision)50,000
Batch cost380,000

If the run produced 95,000 good pouches, the true cost is 380,000 ÷ 95,000 = Rs 4.00 per pouch. Price below that and every order loses money, however busy the factory looks.

Common mistakes

  • Using old material prices. Resin, film and fabric prices move. Cost each batch at what the material actually cost.
  • Ignoring wastage. Divide by good output, not by what went into the machine.
  • Leaving out overhead. Power and machine time are real costs; spread them over output in a consistent way, for example by machine hours.
  • Mixing units. Buying in kg and selling in pieces or cartons is normal, but the conversion has to be consistent.
  • Costing after the fact. If cost is only known at month-end, quotes are already out at the wrong price.

Make it automatic

The reliable way is a system where the recipe is set once, materials are issued from stock at their actual cost when the run is recorded, and labour and overhead are added in the same step. Then every batch carries its own cost, and profit reports use real figures.

Frequently asked questions

How do you calculate the cost per unit of a production batch?

Add materials at their actual cost including wastage, direct labour and a share of overhead, then divide by the number of good units produced.

Should wastage be included in batch cost?

Yes. Divide the batch cost by good output, not by what went into the machine, so wastage is reflected in the cost of every good unit.

How should overhead be allocated to a batch?

Spread power, machine time and supervision over output in a consistent way, for example by machine hours.

My Factory ERP costs every production run as it is recorded, refuses runs the warehouse can't cover, and posts the accounts automatically.